Interreg

Projekt Polsko- Niemieckie Transgraniczne Centrum Dziedzictwa Naturalnego i Kulturowego Regionu Doliny Środkowej Odry dofinansowany przez Unię Europejską ze środków Europejskiego Funduszu Rozwoju Regionalnego

Hydroelectric Power Plant in Ręczyce

Monuments

Information

  • Address: 74-407 Reczyce
The Międzylesie Hydroelectric Power Station in Reczyce, located 12 km from the mouth of the Myśla River, has been preserved in good condition and is a valuable technological site. Before 1945, it supplied energy to the large metal works operating in Ręczyce. The power station was put back into operation in 1946. It is the largest hydroelectric power station in the Boleszkowice municipality, the total power generated by the turbines is 180 kW. The facility is connected to the general power grid.
App Dębno naturalnie

Interesting places, routes, current events. A map with the exact routes of the trips. You won't get lost on the trail with us!

Interreg

Projekt Polsko- Niemieckie Transgraniczne Centrum Dziedzictwa Naturalnego i Kulturowego Regionu Doliny Środkowej Odry dofinansowany przez Unię Europejską ze środków Europejskiego Funduszu Rozwoju Regionalnego